| Week | Day | Date | Lecture | Assign/Handout | Shop | Due |
| 1 | Tuesday | 2-Apr | Introduction to ME71 & Engineering Design |
|||
| Thursday | 4-Apr | In ME Shop | Mandrel Assignment | Introduction & Safety | ||
| Friday | 5-Apr | Mandrel Demos: 9:00am & 1:00pm | ||||
| 2 | Tuesday | 9-Apr | Design Process | Mon-Wed: Mandrel Demos |
||
| Thursday | 11-Apr | Design Process | Block Assignment | |||
| Friday | 12-Apr | Mandrel Due | ||||
| 3 | Tuesday | 16-Apr | Design Process | Group Design Assignment | Mon-Wed: Block Demos |
|
| Thursday | 18-Apr | Motor/Transmission I | ||||
| 4 | Tuesday | 23-Apr | No Lecture | Mon-Wed: Pulley Demos |
Block Due | |
| Thursday | 25-Apr | Group Design Presentations | Transmission Contest Handout | Group Design Due | ||
| 5 | Tuesday | 30-Apr | Motor/Transmission II | |||
| Thursday | 2-May | No Lecture | Transmission Proposal Due | |||
| 6 | Tuesday | 7-May | Motor/Transmission III | |||
| Thursday | 9-May | Visualization & Mechanical Layout | Final Project (FP) Handout | |||
| 7 | Tuesday | 14-May | Final Project Discussion | Final Project (FP) Approval |
FP Preproposal Due, 1:00pm | |
| Thursday | 16-May | Transmission Contest, 10:30am | Transmission Contest, 10:30am | Transmission Due | ||
| 8 | Monday | 20-May | FP Proposal Due | |||
| Tuesday | 21-May | Transmission Debrief | ||||
| Thursday | 23-May | PDR #1 | FP Engineering Drawings Due | |||
| 9 | Tuesday | 28-May | PDR #2 | Machined Part | ||
| Thursday | 30-May | No Lecture | ||||
| 10 | Tuesday | 4-Jun | Value Engineering | |||
| Thursday | 6-Jun | No Lecture | ||||
| 11 | Monday | 10-Jun | FP Demos & Photos, 1:00pm | Final Project Due | ||
| Tuesday | 11-Jun | FP Notebooks | ||||
| Thursday | 13-Jun | Final Project Display, Ramo Auditorium Lobby | ||||
| Attendance Recommended: 1:00-3:00pm. Pickup Projects at 3:00pm | ||||||
| Revised: | 3:12 PM | June 4, 2002 | ||||
| FP = Final Project | ||||||
| PDR = Preliminary Design Review | ||||||
| CDR = Critical Design Review | ||||||